March 2009 Table of Contents

Features
-
6Breaking Ground: Green Solutions
NOWRA’s 18th Annual Technical Education Conference and Expo highlights “The Sustainable Wastewater Opportunity” -
8Basic Training: Out With the Old
A critical step when installing a replacement onsite system is abandonment of the existing onsite system in accord with all rules and regulations -
10Special Feature: Windows to Performance
Here is an alternative design for inspection ports in pressurized onsite treatment systems built with plastic chamber drainfields -
14Machine Matters: Axle Care Basics
Your work machines run on their axles. Are you giving them proper attention? Here are some basic maintenance pointers. -
16Cover Story: Only One Way
Parsley Septic Tanks prides itself on always installing the right system for the site. In fact, “doing it right” have been the company watchwords for years. -
20Special Feature: Pumping Performance
The latest innovations in pumps and blowers give onsite installers more options when designing treatment systems -
22System Profile: Lap of Luxury
A FAST system and sequencing batch reactor with chlorination enables the renovation of an exclusive oceanfront hotel in southern California
Columns
-
24Industry News: Industry News
Company Founder Gary Vermeer Dies; Bord na Mona Opens Innovation Center; Zoeller VP of Marketing Retires; SludgeHammer Receives NSF 40 Certification -
28Association News: Association News
News, Training & Education and Calendar of Events




