Case Study: Alarms, Controls and Monitor Systems

Case Study: Alarms, Controls and Monitor Systems

Interested in Alarms/Controls?

Get Alarms/Controls articles, news and videos right in your inbox! Sign up now.

Alarms/Controls + Get Alerts

Problem: A logistics center in Southern California included occupancy and needed an operating lift station to move in residents. The city where the development was located determined the final controls for the project, which included a SCADA system integrated into the city’s overall SCADA controls system. As this was a sophisticated control panel, with custom programming, the lead time for this control panel was longer than desired by the developer.

Solution: With the city’s approval, Romtec Utilities offered a temporary control panel while waiting for the permanent panel with the standard controls that met the city’s needs.

Result: This allowed the developer to move in tenants faster while simultaneously satisfying the owner of the pumping system and maintaining the project timeline. 541-496-3541; www.romtecutilities.com 



Discussion

Comments on this site are submitted by users and are not endorsed by nor do they reflect the views or opinions of COLE Publishing, Inc. Comments are moderated before being posted.