Problem: A developer with a 250-unit apartment complex in northeastern Washington required a wastewater pump station to address present needs, while providing expansion possibilities for future flows. The wastewater lift station had to be designed for integration into a shared...
Water Pump System Designed to Meet Future Expansion Needs at 250-Unit Apartment Complex
The design had to consider the existing wastewater infrastructure, and be scalable for future pressures, ultimate flows and additional development
Popular Stories
Discussion
Comments on this site are submitted by users and are not endorsed by nor do they reflect the views or opinions of COLE Publishing, Inc. Comments are moderated before being posted.