Romtec utilities case study 230906 152842
Problem: A logistics center in southern California included occupancy and needed an operating lift station to move in residents. The city where the development was located determined the final controls for the project, which included a SCADA system integrated into the city’s overall SCADA controls system. As this was a sophisticated control panel, with custom programming, the lead time for this control panel was longer than desired by the developer. Solution: With the city’s approval, Romtec Utilities offered a temporary control panel while waiting for the permanent panel with the standard controls that met the city’s needs.Result: This allowed the developer