Loading...

Results for

Displaying results 2221-2240 of 4605


Select Topics
Photo2

The Future Is Tied to Technology and Automation

A thriving onsite wastewater industry pushes us to constantly adapt to changing environmental regulations and new tools and equipment
Communities Take Differing Approaches to Wastewater Regulation Around Washington’s Puget Sound

Communities Take Differing Approaches to Wastewater Regulation Around Washington’s Puget Sound

Thurston County and the town of Lynden are at opposite ends of Puget Sound, and in the last month both took action on wastewater contamination in…
Franklin electric submonitor 171208 151812

Franklin Electric’s SubMonitor Connect

Franklin Electric’s SubMonitor Connect electronic motor protector provides three-phase protection and enhanced troubleshooting proficiency.…
Industry News - August 2017

Industry News - August 2017

Waterloo biofilter case study 171208 144711

Advanced Treatment Units

Rocky coastal properties present system challengesProblem: Given local setback rules and challenging soil limitations on the rocky coast of…
Product Focus - August 2017

Product Focus - August 2017

Dsc 0817

A Guide for Maintenance of Membrane Bioreactor Systems

Membrane bioreactors need some extra care, so follow these steps for top-notch operation and maintenance service
Google screen

Google Business Listings Make It Easier for Customers to Find You

If your company doesn’t take advantage of ‘Google My Business’ yet, here’s how to claim your listing
Singulair tnt 2

All-in-One ATU Delivers High-Quality Effluent on Sensitive Sites

Legacy Septic and Excavation thrives on onsite treatment system repairs and replacements. Those projects often involve challenging sites with clay…
1708 Cover

August 2017

Mixing Sand In With Underlying Soil

No Place to Go: Placing a New Soil Treatment System Over the Old

Using the same STA should be a last resort, but there are some potential solutions if it’s necessary
Onsite arithmetic 171208 143748

Onsite Arithmetic: A Basic Tank Problem

Test your septic math skills — or practice for your next certification exam
Onsite arithmetic 171208 143749

Onsite Arithmetic: A Basic Tank Problem – Answers

To answer these questions I would first convert the measurements in inches to feet:60 inches ÷ 12 inches/foot = 5 feet 108 inches ÷ 12…
Rr logo 171208 143748

Rules and Regs: Massachusetts Licensing Bills Draw Pumper’s Opposition

In this month’s regulations update, some homeowners in a small Wisconsin town pay for sewer despite working septic systems, and two proposed laws will make it harder for pumpers to maintain necessary licenses in Massachusetts
Dsc02633

How CECs May Affect Land Application

In the future, land application rules may change due to contaminants of emerging concern, but more research needs to be done
Franklin electric fe select large

Product News: July 2017

Check out the latest product offerings for the onsite wastewater treatment industry
Legacy11

Elite Service Provider Puts Extra Effort Into Homeowner Education

Legacy Septic supplies a customized septic care plan for all their customers
With Plans

Fantastic Fixes Are the Specialty of Legacy Septic & Excavation

George Schooley loves the challenge of repairing and replacing troubled treatment systems on sites with cramped spaces and difficult soils and terrain.
Stella 2

One Girl’s Battle to End Straight Pipe Sewage Dumping

The story of Stella Bowles and her work to upgrade wastewater systems along a Nova Scotia river should inspire our industry.
Can You Work Around Daily Estimated Sewage Flow Numbers?

Can You Work Around Daily Estimated Sewage Flow Numbers?

System sizing rules become an issue when homeowners invariably focus on reducing onsite system costs during a building project.