Loading...
Hiblow usa case study 240607 144709
Problem: Camp Chen-A-Wanda in Thompson, Pennsylvania, welcomes thousands of children and support staff each summer. Managing wastewater, especially full-service commercial kitchen waste, is a challenge for any seasonal camp. In 2022, a commercial aerobic pretreatment system consisting of 18 Anua PuraACE reactor pods was installed, replacing the camp’s outdated septic system to meet current demand. The systems demanded air pumps equipped to handle the large waste stream of 15,000 to 25,000 gpd. Solution: The systems utilize 18 HIBLOW HP-200 alarm units. Their linear diaphragm technology mitigates noise levels (important in a camp setting) while providing flows of approximately 950 gpm. The
Please login or register to view Onsite Installer articles. It's free, fast and easy!
Jan5683151 110819 wls willis family crash anniv6vo vid
Next ›› How to Save 6 Lives Today

Related