In February 2010, Crane Pumps & Systems was invited to a meeting hosted by the Roamingwood Sewer and Water Authority and their engineering consultant Cardno BCM to discuss the failing gravity-based sewer system in Lake Ariel, Pennsylvania. The community includes a lake, a small ski resort, a golf course, and hiking and bicycle trails, all built on a rock foundation. The existing 26 pumping stations included several different brands of pumps, resulting in outrageous electrical consumption and requiring continuous maintenance.

The stations ranged in service from less than five years old to over 18 years old. Each duplex station had carried an initial $150,000 to $200,000 investment and now required replacement. Crane Pumps & Systems provided Lake Ariel a low-pressure sewer design that eliminated all of the lift stations and projected an $80,000 savings every year just in electrical costs. The new design included a Barnes EcoTRAN packaged system fitted with the Barnes Omni Grind grinder pump to be installed at each home site. The station is hidden under a tank cover disguised as a landscape garden rock. The newly designed pressure sewer system utilizes much smaller pipe than a gravity-based system and eliminates the need for 40-foot open cuts through a neighborhood with pristine trees. The only entry points into the system from home site to treatment facility are the homes themselves. With no secondary leakage, treatment gets simpler, demands less energy and money, and is easier to predict what’s coming out the other end.

Installation

Crane Pumps’ representative, CW Sales, continues to support this replacement project and the Roamingwood Water Authority is pleased with the new design and will enjoy savings for years to come.

Solution

Crane Pumps & Systems recommended a new pressure sewer system design utilizing KY Pipe hydraulic modeling software. The design eliminated all 26 of the failing stations and provided $80,000 per year in electrical savings. The new system allows the biosolids to pass through much smaller pipes than a gravity sewer system and still drives sufficient head pressure to push wastewater to treatment even with a 210-foot elevation change.