Editorial Canadian Pair Take Over an Established Excavating Firm and Rename It Dirtwerx Childhood friends Josh Melanson and Clint Watrich reunite and tap into a growing market for septic system installation around Vancouver, British Columbia July 09, 2019
Editorial Onsite Professionals Make a Big Splash at a Virginia Water Park Project A new campground system featuring an aerobic unit and UV treatment allows tourist attraction expansion on environmentally sensitive Chincoteague Island July 09, 2019
Editorial Tight Space Creates a Design Puzzle in the Arizona Desert When an assisted living facility retrofit requires added wastewater treatment capacity, a pair of ATUs and a chambered drainfield do the trick April 09, 2019
Editorial Travis Johnson and His Hardworking Crew Are Ice Road Installers A daily half-mile trek over a frozen Minnesota lake kept this island ATU project interesting for the crew at Septic Check February 06, 2019
Editorial University Sustainability Project Incorporates Futuristic Wastewater Reuse Technologies New rural campus includes graywater reuse, constructed wetlands and advanced rainwater runoff strategies to return as much water as possible to the local aquifer September 11, 2018
Editorial A Lakefront Estate Requires an Onsite Technology Upgrade A homeowner’s environmental concerns and restricted lot space pointed Michigan installer Dervin Witmer toward a Norweco Singulair Green ATU August 07, 2018
Editorial Looking Back: Waterloo Biofilter Systems Remains an Effective Answer After 20 Years Small oceanfront lot in Gloucester, Massachusetts, presented challenges for onsite designers. The system solution is still beating minimum treatment standards with no end in sight. August 07, 2018
Editorial A California Sauerkraut Factory Requires a Complex Modular Treatment Solution The existing flower-sorting facility started with a tiny onsite system serving one restroom. Designer Ken Mabie faced the challenge of taking the flow from a trickle to 2,500 gpd. July 09, 2018
Editorial Compact Fuji Clean USA Unit Chosen to Replace a Failed Virginia System An onsite designer finds there’s no room to fit in a second conventional system and turns to a one-tank pretreatment solution May 09, 2018