Zoeller case study
Prepackaged lift station installed at equine hospital Problem: An equine hospital in the Central Bluegrass Region of Kentucky recently expanded its facilities with a state-of-the-art hospital. The hospital treats athletic horses from across the country. They needed a pumping station to lift the sewage to the lateral lines in this septic system.Solution: After reviewing the pumping needs for the conventional septic system and lateral field, the engineer chose a Zoeller prepackaged lift station to meet the requirements. The Fiberglas lift station is 72 inches in diameter and 162 inches deep, with a capacity of 1,675 gallons, which meets the septic system design.